Answers are grounded in this paper and cite their sources.
Hydrokinetic energy (HKE) has a large resource and the basic technology required to exploit it already exists. Yet, despite decades of research and numerous successful demonstrations, widespread deployment has not followed. This position paper argues that further incremental improvements in turbine efficiency are unlikely to alter the prospects for widespread deployment. The principal challenge is economic: HKE must find applications in which its system value justifies its comparatively high cost. In the short term, managed waterways such as irrigation and water-supply canals offer the most credible route, but viable projects will require mass-produced turbines, array-scale deployment, better use of available hydraulic head, and substantial reductions in power take-off, installation and maintenance costs. In the medium term, HKE should increasingly share electrical, structural and operational infrastructure with other renewable-energy technologies. Large arrays in natural rivers remain a longer-term prospect. Without substantial cost reduction, deployment at scale and sustained support from governments or patient strategic capital, HKE risks remaining a technically successful but commercially marginal renewable-energy technology.
No takes yet. Share an insight, caveat, or question.
Thorsten Stoesser (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: