Rework continues to pose a significant challenge to construction project performance, leading to cost overruns, schedule delays, and compromised quality. While prior research has identified rework causes in fragmented or discipline-specific contexts, this study presents a holistic and quantifiable framework that integrates expert consensus with a multidimensional fuzzy inference system (FIS). Using inputs from 200 construction professionals, the study employs Kendall’s coefficient of concordance to validate expert agreement on 43 critical rework causation factors and then applies a Mamdani-type FIS weighted by relative importance index values to model rework risk across four key domains: design; construction management; labor; and client/consultant interaction. The scientific contribution of this research lies in its ability to translate subjective expert judgment into interpretable, scalable, and data-light risk outputs, something not achievable through traditional regression- or AI-based models alone. This approach enables proactive identification and ranking of rework causation factors even in early-stage or data-scarce environments. By producing a calibrated, adaptable decision-support model, the study empowers practitioners to prioritize interventions, integrate predictive analytics with tools like building information modeling, and improve construction planning and resource allocation. The findings offer methodological advancement and practical utility in supporting sustainable, rework-resilient project delivery.
No takes yet. Share an insight, caveat, or question.
Gündüz et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: