Answers are grounded in this paper and cite their sources.
Power and water public–private partnerships (PPPs) in the Gulf Cooperation Council (GCC) have delivered unevenly. Assessments centre on contracts, finance and risk. Prior work has examined readiness and change management largely outside PPPs. We surveyed 300 stakeholders across 30 projects, randomly drawn from 62, in Kuwait, Saudi Arabia and the United Arab Emirates. Responses within projects were selected purposively, so responses are nested within projects. Success was measured with a published and validated Project Success Index. A multiple regression on six factor groups explained 91.8% of variance (adjusted R2 = 0.916; F(6, 293) = 543.4; p < 0.001). All six were positive and significant. Organisational structures and processes (standardised β = 0.355) and individual and group dynamics (β = 0.320) had the largest estimated coefficients. Planning and external influences followed closely (β = 0.214 and 0.211). Managing resistance ranked lowest (β = 0.104). The design is cross-sectional and single-source, so the results show association, not causation. As a practical suggestion, sponsors and procurers may consider assessing readiness before financial close and managing change throughout the project lifecycle, although the timing of assessment was not tested.
No takes yet. Share an insight, caveat, or question.
Aljaber et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: