Answers are grounded in this paper and cite their sources.
As flood risks intensify alongside rapid urban development, greater attention is needed on how flood risk and resilience are considered during housing development approval. In Johor, Malaysia, planning frameworks, technical guidelines, and flood-related information are already available to support development decisions, yet their use within the approval process is not always straightforward. This preliminary qualitative study examines the institutional gaps that influence how flood risk and resilience are incorporated into housing development approval. Semi-structured interviews were conducted with four key stakeholders representing state economic planning, state planning, local authority, and land administration perspectives, and the data were analysed thematically using ATLAS.ti 25. Four themes emerged: (i) policy strengthening in flood hotspot areas, (ii) gaps between federal guidelines and state-level implementation, (iii) development size and environmental sensitivity, and (iv) legal framework and checklist evaluation. The findings show that fragmented responsibilities, uneven implementation of guidelines, limited use of flood-related data, and reliance on compliance-based checklists can affect how consistently flood risk and resilience are considered in approval decisions. The issue is therefore not only whether policies and technical tools exist, but also how they are interpreted, coordinated, and applied across agencies. As a preliminary study, the findings provide exploratory institutional insights rather than conclusions that can be generalised to all local authorities in Johor. The study points to the need for further empirical work and stronger institutional coordination in integrating flood risk and resilience into housing development approval.
No takes yet. Share an insight, caveat, or question.
Mohammad et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: