Answers are grounded in this paper and cite their sources.
This study examined associations between project management practices and performance of the Social Protection Transformation Project in Gasabo District, Rwanda. Its three objectives assessed project planning, project implementation, and project monitoring and evaluation practices. Guided by the Resource-Based View, Systems Theory, Theory of Change, and Stakeholder Theory, the study used descriptive and correlational approaches with qualitative interviews. From a population of 308, Slovin’s formula yielded a target sample of 174; 164 valid questionnaires (94.25%) were analysed using SPSS 29, Pearson correlation, and multiple regression. The regression model explained 80.0% of the variation in reported project performance (R² = 0.800). Planning (B = 0.204, p = 0.001), implementation (B = 0.202, p < 0.001), and monitoring and evaluation (B = 0.492, p < 0.001) were positive, statistically significant predictors. Monitoring and evaluation had the largest standardised coefficient (β = 0.523), highlighting the importance of timely reporting, field verification, and feedback. The study recommends that MINALOC, LODA, and Gasabo District prioritise measurable monitoring routines alongside coordinated implementation and realistic planning. Given the cross-sectional design, the findings indicate association rather than proven causation.
No takes yet. Share an insight, caveat, or question.
Kayirangwa et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: