Answers are grounded in this paper and cite their sources.
Power transformer (PT) energization implies a large inrush current during the transient. These inrush currents produce a malfunction of the protection systems, especially of the differential protections. Moreover, in some weak power systems they can produce inacceptable voltage reduction that implies disconnection of critical loads. For these reasons, there are some inrush current mitigation techniques. One of these techniques is based on the use of a reduced-power auxiliary transformer, known aspremagnetization transformer(Pre-MT). This technique is very popular in the marine industry. In this article, the reduction of the power rating of the Pre-MT is studied. The capacity requirement for the Pre-MT can be reduced through the correct dimensioning of the voltage ratio. For this purpose, several tests have been performed on a 1,000-kVA PT by using different Pre-MT with taps. The results obtained are satisfactory as the inrush current of the main PT has been reduced up to 250 times, reaching only 0.4% of its rated capacity. Afterward, electrical and thermal simulations were performed to go a step further in the Pre-MT sizing. It was concluded that the required Pre-MT rated power can be reduced by 1,000 times the main PT one without jeopardizing either the integrity of the equipment or the premagnetization performance.
No takes yet. Share an insight, caveat, or question.
Martínez-Lozano et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: