Answers are grounded in this paper and cite their sources.
Despite growing adoption of Building Information Modelling (BIM) and Immersive Technologies (ImT), their integration requires organisations to address technical and non-technical conditions, yet evidence on the relative importance of these requirements remains limited. This challenge is particularly relevant in Australia, where digital capability coexists with a dispersed institutional environment and the absence of a uniform national BIM mandate. This study examines expert-assessed priorities for BIM-ImT integration in Australian building projects using a hybrid Delphi-Analytic Hierarchy Process (AHP) approach. Eight Delphi experts validated 53 integration criteria, which were subsequently assessed by 15 senior Australian professionals across five attributes using AHP. The findings highlight the importance of foundational conditions for reliable information exchange. Technical priorities include computational processing capacity, semantic interoperability, sensing integration, interface usability, and data standardisation. Non-technical priorities emphasise user familiarity, organisational confidence, collaborative effectiveness, cost considerations, and governance support. Photorealistic rendering and cloud optimisation received lower priorities. Institutional Theory is applied as a post-prioritisation interpretive lens for interpreting these patterns in relation to coercive, normative, and mimetic influences. The study advances BIM-ImT integration research by establishing an expert-informed hierarchy of integration priorities grounded in the Australian construction context, providing a basis for industry-level implementation planning and future comparative research.
No takes yet. Share an insight, caveat, or question.
Bảo et al. (2026) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: