The relocation of the Disaster Recovery Center (DRC) is a strategic initiative for banking business continuity, yet it carries operational risks that must be managed carefully. This study analyzes the risk management of the DRC relocation at PT Bank Tabungan Negara, Tbk (BTN) by integrating the ISO 31000:2018 and COBIT 2019 frameworks. A qualitative descriptive method with a case study approach was applied, drawing on interviews and internal assessment documents. Risks were identified, analyzed using a probability and impact matrix, evaluated, and treated through the ISO 31000 stages, while IT governance was assessed through the COBIT 2019 APO12 (Managed Risk) domain. The results reveal four main risks, with the unavailability of network and supporting cabling infrastructure classified as an extreme risk that directly threatens the cut-over phase and the achievement of Recovery Time Objective (RTO) and Recovery Point Objective (RPO) targets. The governance evaluation shows that the APO12 capability is at Level 3 (Established Process), indicating a coordination gap between IT planning and procurement. The study recommends fast-track procurement, independent quality assurance, and technical cross-review of procurement documents to ensure service resilience and business value.
No takes yet. Share an insight, caveat, or question.
Muslim et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: