Traditional construction contracts predominantly rely on textual provisions and two-dimensional drawings, and building information modeling (BIM) models and production data often are managed separately from the contractual information system. This separation weakens the traceability and operational use of BIM information during prefabricated component manufacturing. This study developed a contract-linked BIM framework for production schedule management of prefabricated ultrahigh-performance concrete (UHPC) curved components. The framework links production-contract requirements with a component-based BIM model, BIM-derived component production lists, planned production schedules, and actual-progress information. BIM components are decomposed into production-manageable units, assigned unique identifiers, and classified into component systems to support the extraction and verification of component names, types, quantities, and model representations. A constraint-based component-standardization procedure then is used to reduce unnecessary type variation and support mold reuse. Process durations and task dependencies are encoded in Rhinoceros and Grasshopper (GH) to generate planned production schedules. QR codes attached to physical components connect them with their corresponding digital information, and field video and image records are stored in a database. Time-related production data are processed and mapped back to BIM components through GH to compare planned and actual progress, identify deviations, and support schedule feedback adjustment. The framework was implemented in the Solar Ark 4.0 project in China. The standardization rates of the plate and arch component families were 34.7% and 44.0%, respectively. The model-generated production duration was 28 days, compared with an actual duration of 31 days and a contractual production period of 40 days. The findings demonstrate the feasibility of using contract-linked BIM information to improve the traceability and controllability of component production schedules. Rather than replacing a conventional construction contract, the proposed framework uses BIM-derived production documents and schedule information as traceable management inputs for prefabricated UHPC component production.
No takes yet. Share an insight, caveat, or question.
Zhou et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: