Answers are grounded in this paper and cite their sources.
This study examined the relationship between operator work organization and manual assembly process performance at two production batch sizes. In a laboratory assembly system inspired by a furniture-industry process, three arrangements were compared: fixed assignment to workstations, rotation across all four workstations, and rotation limited to two workstations. Each order comprised 30 units of three product variants assembled in batches of 2 or 10. Three independent runs per configuration yielded 18 experiments and 72 operator working-time records. Order completion time was defined as the longest recorded operator working time. Limited rotation produced the shortest mean completion times: 1042.7 s for batches of 2 and 956.7 s for batches of 10. Two-way analysis of variance identified statistically significant effects of work arrangement, batch size, and their interaction. The arrangement with the shortest completion time did not always have the highest assembly-time share among operators. The findings support the joint assessment of order completion time and operator time utilization. As the arrangements also differed in buffering and workstation sharing, the results apply to the complete laboratory configurations and do not isolate the effect of rotation alone.
No takes yet. Share an insight, caveat, or question.
Żywicki et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: