Industrial-park virtual power plants (VPPs) must provide regulation despite forecast errors in industrial demand and photovoltaic (PV) generation and the recovery requirements of flexible resources. This paper develops a day-ahead capability assessment framework for a single 2.5 h regulation activation. Each scenario-specific capability value is obtained from a feasible full-day schedule for aggregate production loads, auxiliary systems, and energy storage, including post-activation recovery. Causal load–PV forecast-error trajectories are organized into macro-operating regimes and representative sub-scenarios, while a conditional value-at-risk (CVaR) constraint enforces a risk budget for the worst-start reserve shortfall under the reduced 12-medoid scenario distribution. The framework is evaluated against the complete historical error distribution and over 300 chronological operating days. Compared with scenario expectation, the proposed method reduces mean downward worst-event shortfall (12.565 versus 14.062 kWh). The single-forecast benchmark nevertheless achieves slightly lower upward estimation error and worst-event shortfall and a higher mean illustrative net benefit. Across 12 chronological risk-audit dates, the full-history CVaR exceeds the reduced-scenario estimate in both directions, with the calibrated risk budgets exceeded on all 12 upward dates and four downward dates under the full historical distribution. Thus, the proposed framework provides a recovery-aware, scenario-conditional risk-budgeted approach to reserve declaration, clarifying the trade-offs among deliverability, tail risk, estimation accuracy, and economic return. Ex-post reference capabilities are reconstructed from hourly measurements.
No takes yet. Share an insight, caveat, or question.
Zhang et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: