Answers are grounded in this paper and cite their sources.
Statistical process monitoring is commonly based on control charts for which the in-control distribution of the monitoring statistic is stable over time. We consider a Bayesian fully borrowing (FB) monitoring scheme in which the estimation of the process parameter at each monitoring time uses all observations accumulated up to that time. As a consequence, the FB estimator evolves with the amount of information available, leading to a time-dependent monitoring procedure whose control limits and run-length characteristics differ from those of conventional fixed-distribution charts. We investigate these features in detail and determine the control-limit multiplier by calibrating the attained in-control median run length to a prespecified target. Particular attention is given to the zero-state setting, in which the process shift occurs at the start of monitoring, and the detection performance of the FB chart is assessed using median run length for a range of shift magnitudes. Monte Carlo studies are used to examine the effects of subgroup size and shift magnitude, with the proposed procedure compared with a conventional EWMA chart having a comparable in-control performance. The results indicate that, under suitable modeling assumptions, the fully borrowing scheme can achieve appreciable improvements in the detection of sustained process shifts. An industrial process dataset is further analyzed to demonstrate the implementation and practical applicability of the proposed Bayesian monitoring procedure.
No takes yet. Share an insight, caveat, or question.
Tunal et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: