Experimental analysis demonstrates that prefabricated concrete liners restore load-bearing capacity in box culverts, suggesting a new rehabilitation method.
Conventional trenchless pipeline rehabilitation technologies are primarily designed for circular pipelines, with limited applicability to box culvert structures. Even when adapted, these methods often lead to significant reductions in the effective cross-sectional area and fail to enhance the structural load-bearing capacity due to geometric incompatibilities. To overcome these limitations, this study proposes a novel construction approach that employs prefabricated high-strength thin concrete segment liners for the reinforcement of underground box culverts. The feasibility of this method was validated through full-scale (1:1) experimental construction in a purpose-built test culvert, demonstrating rapid and efficient installation. A static stacking load test was subsequently conducted on the reinforced upper section of the culvert. Results indicate that the proposed reinforcement method effectively restores structural integrity and satisfies load-bearing and serviceability requirements, even after removal of the original roof slab. Additionally, a finite element analysis was performed to simulate the stacking load test conditions. The simulation revealed that variations in the mechanical properties of the grout between the existing structure and the new lining had minimal impact on the internal force distribution and deformation behavior of the prefabricated segments. The top segment consistently exhibited semi-rigid fixation behavior. This study offers a promising strategy for the rehabilitation of urban underground box culverts, achieving structural performance recovery while minimizing traffic disruption and enhancing construction efficiency.
No takes yet. Share an insight, caveat, or question.
Wang et al. (2025) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: