The microtunneling project enhances sewer system capacity beneath I-75, suggesting improved infrastructure resilience.
To expand capacity and provide redundancy to their sewer collection system, the City of Venice, Florida, completed the Second Force Main Under I-75 project to add a parallel force main beneath Interstate 75 (I-75), with tie-ins to existing infrastructure and a provision for a future connection. At the crossing location, I-75 is a limited-access, heavily traveled, divided highway over 1,000 ft wide from west to east boundaries. Design phase permitting efforts secured approval for a design alternative to Florida Department of Transportation (FDOT) requirements to allow for trenchless construction below the pavement with open-cut construction in the median as opposed to a single, full-length trenchless installation. Project construction was completed in June 2024. This paper summarizes the design and permitting efforts for crossing I-75, the drivers and decisions for the installation method and vertical alignment, explains the contractor pre-qualification and selection process, and provides an overview of construction, including lessons learned and guidance for future designs.
No takes yet. Share an insight, caveat, or question.
Hanson et al. (2025) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: