Answers are grounded in this paper and cite their sources.
Case study reports challenges in FRP pipeline rehabilitation for stormwater pump stations, highlighting engineering evaluations.
The Irving Flood Control District Section III (IFCD-3) provides flood control facilities and operations for the Valley Ranch community in Irving, Texas. The IFCD-3's pump station, constructed in 1979, discharges stormwater up and over a levee to the Elm Fork Trinity River via four 42-in. and two 30-in. steel pipelines. After a recent condition assessment indicated significant corrosion of the discharge pipelines, IFCD-3 contracted for the engineering evaluation of pipeline repair options and development of a rehabilitation plan, followed by the internal rehabilitation of the pipelines by fiber reinforced polymer (FRP) application. This paper discusses the challenges faced during the internal FRP rehabilitation of the stormwater pump station steel discharge pipelines and how those challenges were overcome.
No takes yet. Share an insight, caveat, or question.
Stephens et al. (2025) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: