Review of water injection impacts and injection-production relationships in shut-in wells, indicating efficiency gains.
After years of water injection development, the oilfield has stepped into a high water-cut stage. A large number of oil and water wells have been shut in for a long time due to various reasons. By review of reservoirs and clear potential adjustment, Review of Post-Infilled Reservoirs, using high-precision numerical simulation technology to analyze the characteristics and potential of remaining oil in long-term shut-in well areas. Reconstructing injection-production relationships to enhance reserve control, well network adjustment and addition of water injection directions, combining with injection-production conditions to restore injection well points. Fine-tuning extraction to optimize injection-production structure. The representative a certain block was selected to conduct well shut-in treatment. The reservoirs were re-evaluated and the injection-production relationship was restructured, followed by finely adjustment of the potential extraction methods. This aims at improving development efficiency and benefits, which has shown good results in managing long-term wells shut-down. The existing resources have been revitalized. The overall development situation is improving. the development effect has been significantly improved.
No takes yet. Share an insight, caveat, or question.
Ying Han (2025) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: