Answers are grounded in this paper and cite their sources.
Assessment reveals a 4-day hydraulic retention time improves wastewater treatment efficiency, suggesting practical application in rural settings.
Constructed wetlands (CWs) offer a low-cost and sustainable treatment option. However, their performance strongly depends on hydraulic retention time (HRT), which also influences land use and construction requirements. This study aimed to determine the minimum HRT required for treating wastewater from rice noodle handicraft villages after the biogas process to meet the National Technical Regulation on Industrial Wastewater (QCVN 40:2025/BTNMT), Column B. The CW system was set up in a glass tank (50 × 30 × 50 cm) with a 40 cm substrate layer consisting of yellow sand mixed with crushed stone, limestone (1 × 2 cm), and gravel (3 × 5 cm), and was planted with Cyperus alternifolius at a density of 18 plants per CW unit. The system was operated for 70 days with daily sampling. Results showed that effluent quality met QCVN 40:2025/BTNMT, Column B standards after 4 days, with average treatment efficiencies of 89.2% for total suspended solids (TSS), 82.4% for chemical oxygen demand (COD), 54.7% for total nitrogen (TN), and 78.1% for total phosphorus (TP). Although longer HRTs improved treatment efficiencies, removal rates plateaued after the fourth day. Therefore, a 4-day HRT is recommended as an optimal balance between treatment performance and construction cost. These findings provide practical implications for scaling up CW systems to improve wastewater management in Vietnamese handicraft villages.
No takes yet. Share an insight, caveat, or question.
Thành et al. (2025) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: