Quantitative analysis compares cost, quality, and turnaround time of deep cement mixing among subcontractors, suggesting efficiency links to lower cost and higher productivity.
The Trans Java toll road project at the eastern end connects Probolinggo-Banyuwangi (Probowangi), along 171,516 km. Phase 1 of the Gending-Besuki section is being carried out. This study analyzed the difference in time, cost, and quality of deep cement mixing (DCM) work by 4 subcontractors in section 2 (STA 09+000 - STA 20+200) who carried out soil improvements before landfilling. Quantitative methods are used to compare time, cost, and quality. The results show the completion time of DCM: PT Keller Ground Indonesia (85 days), PT Leekang Jaya Konstruksi (116 days), and PT Geotekindo (31 days). Highest daily productivity: PT Geotekindo (428.63 m³/day), followed by PT Keller Ground Indonesia (280.32 m³/day) and PT Leekang Jaya Konstruksi (277.53 m³/day). The lowest DCM price is PT Geotekindo (IDR 681,296/m³), PT Leekang Jaya Konstruksi (IDR 706,980/m³), and the highest PT Keller Ground Indonesia (IDR 788,437/m³). Quality (UCS) of all subcontractors ? 1 MPa. Efficiency shows that subcontractors with high productivity have faster turnaround times, lower costs, and quality to standards.
No takes yet. Share an insight, caveat, or question.
Sholihin et al. (2025) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: