Synapse
⌘+K
Synapse
PulseExploreClubsResearchersJournals
Instagram
HomeClubsExplore
August 28, 2024Jurnal Teknik Sipil

Analysis of Heavy Equipment Management Based on Cost and Time Values in the Local Road Improvement Project Package 6

View Full Paper
Ask AI
Bookmark
Share

Authors

TRTezar Aulia RachmanMFMuhammad Iqbal FirdausUniversitas Trisakti

Discussion

Loading...

Member takes

Implication

Key Points

Key points are not available for this paper at this time.

Cite This Study

Rachman et al. (2024) studied this question.

synapsesocial.com/papers/68e5aa5eb6db64358754482chttps://doi.org/10.26418/jts.v24i3.82050
View Full Paper
Ask AI
Bookmark
Share

Also Consider

Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context:

  1. 1ANALYSIS OF HEAVY EQUIPMENT USAGE FOR INLET CONDUIT WORK ON CIJUREY DAM PROJECT PACKAGE 12024
  2. 2Optimizing the Use of Heavy Equipment on Earthworks on the Syamsudin Noor Banjarbaru Airport Ring Road2024
  3. 3“Analysis The Productivity Of Heavy Equipment Cut And Fill Work” (Case Study: Package 6th Leuwikeris Dam Project Tasikmalaya-Banjar)2025
  4. 4Analysis of the Productivity of Excavator and Dump Truck Heavy Equipment in the Excavation Works for the Construction of Jakarta MRT Station Cp 203 Phase 2A2025
  5. 5Comparative Analysis of Cost, Quality, and Time on the Productivity of Deep Cement Mixing Work Between Subcontractors in the Probolinggo-Banyuwangi Toll Road Construction Project Section 22025