This case study analyzes the impact of mining activities on casing stability, highlighting negligible effects on gas wells. Monitoring confirms the integrity of the casing structure.
This study addresses the issue of coordinated development of coal, oil, and gas resources in the Yulin-Shenmu Coalfield. Taking the 132,201 working face of the Xiaobaodang No. 1 Coal Mine as a case study, the study combines FLAC3D numerical simulation with on-site monitoring to analyze the impact of mining activities on the stability of gas well casings. Simulation results indicate that mining activities cause stress redistribution in the surrounding rock, with a maximum shear stress of 5.8 MPa, which is far below the shear strength of the casing. The maximum horizontal displacement of the wellbore is only 23 mm, with uniform overall deformation and no shear failure. On-site monitoring showed that the airtightness was intact, and the wellbore diameter test did not detect any destructive damage such as deformation or cracks. Concurrently, fiber optic strain monitoring of the inner and outer casings aligns with simulation results, confirming no significant instability caused by mining activities. The conclusion is that mining activities have a negligible impact on the stability of the gas well casing-concrete composite structure. The dual casing-cement ring structure effectively coordinates deformation to ensure safety. This finding provides a reliable technical basis for the coordinated exploitation of coal, oil and gas resources at the Xiaobaodang No. 1 Coal Mine and similar mines.
No takes yet. Share an insight, caveat, or question.
Gao et al. (2025) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: