The New Braunfels Utilities Surface Water Treatment Plant Discharge Water Line is a 30-in./24-in. diameter potable water distribution line that required a 413 LF trenchless installation beneath the Guadalupe River. This installation had tight alignment tolerances, was beneath a river with highly incised embankment conditions and a 20-ft surface elevation difference between shaft locations, was next to an active pump station, and had inconsistent subsurface ground conditions. Three installation methods were considered: Horizontal Auger Boring, Horizontal Directional Drilling, and Vertical-curved Microtunneling. The project team selected the vertical-curved microtunnel method which reduced risk and allowed for an optimized alignment compared to other methods. Ultimately, it was utilized in a successful installation that satisfied all parties.
No takes yet. Share an insight, caveat, or question.
Weinert et al. (2024) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: