Answers are grounded in this paper and cite their sources.
Typical setup for well unloading of oil or gas wells during exploration or appraisal and development phases involved utilization of burner boom where hydrocarbon will be flared off. Flaring would require additional equipment to burn the hydrocarbon, water cooling system, water cooling system to control the heat radiation from burning hydro carbon and accessories related to rigging up burner boom i.e. kingpost and padeye. This requirement would also be subjected to the type of rig being used to support the drilling activities and the existence of the burner boom for the activity to remove additional cost to install kingpost and padeye. For an infill project in offshore Malaysia, three (3) infill gas producer wells were planned to be drilled to extend the field production and hub life above the Turn Down Ratio (TDR). The initial plans involved performing well unloading using the typical well test setup i.e. by installing the burner boom and water cooling systems. A semi tender rig will be used to install the kingpost and padeye prior to the mobilization and rig-up of the burner boom, to reduce the rig standby time. With the vision to achieve zero flaring/venting, even small volume/scale initiatives can be considered as a crucial contributor to this vision. Hence, the unloading plan was revisited, and all options were re-evaluated to ensure that the gas wells can be unloaded safely. Since the field has existing platform and facilities to process/evacuate the gas, condensate and water, the best option was to flow the fluids from the newly drilled wells to the existing facilities. This would eliminate the requirement of the burner boom, kingpost and padeye installations and additional water-cooling system. Evidently, with this option, the team would be able to reduce the project cost significantly and subsequently the hydrocarbon can be produced immediately. This paper covers the detailed planning of the well unloading through the existing facilities which involved equipment spotting, lifting plans, challenges faced during these activities, risks and mitigations and lessons learned that can be replicated in future new infill/development wells while contributing to the zero Green House Gas (GHG) emissions journey.
No takes yet. Share an insight, caveat, or question.
Razali et al. (2024) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: