Answers are grounded in this paper and cite their sources.
Block H consists of deepwater gas wells tie-back to FLNG via 1,830 meters of dual risers. During LNG plant upset, a minimum feed gas is required not only to supply fuel gas, but also to sustain the riser stability to prevent slugging and surge due to nature of dynamic gas flow in deepwater risers. The objective is to perform field trial tests to stretch the turndown limit to minimize flaring to environmental impact during process shutdown. An OLGA model was revisited to run several cases below the design limit to review the well pressures, subsea pressures, liquid hold-up fraction profiles, total liquid hold-up profile in each subsea component as well as topside liquid arrival rates. A work instruction was practically developed for the field trial test to compromise the lower limit of the riser turndown against flow stability from the wellbore, XMT, flowlines, risers, all the way to Inlet receiving facilities at topside. A mitigation plan was prepared to prevent slugging flow and avoid operation interruption in overall system at topside facilities and subsea production system. The results from the field trial test indicated a lower limit of the riser turn down could be as low as 50 MMSCFD for a period. A step reduction of 5MMSCFD feed gas from the turndown design limit of 70MMSCFD was performed to monitor dynamic flow behavior in the entire system to adjusted real-time process parameters. At the flow lowered than 60MMSCFD, an increase in liquid holdup at subsea and liquid levels at topside separators were observed, but manageable thru the level control valves in the separator integrated system and process control loops. However, at a flow rate lower than 50MMSCFD, an unstable flow in the one flowline was detected as well as instability at the wellbore. This is because each wellbore requires a minimum flow rate for deliquification. Besides, the multiphase flow regime in the riser section subsequently started to change from annular to churn flow and eventually became slugging flowing to the topside as liquid level at slug catchers and separators increased. The decision was to shut down one Rotan well and minimize the three wells from the field to ensure enough energy could sweep out liquid at the risers and flowlines while minimizing flaring during this period. Optimizing flare requires a comprehensive approach considering various points of process parameters to avoid operation interruption. The compromise solution to sustain overall stability is to bring down the riser turndown rate as low as reasonably practical and leading to the flare reduction at downstream of Gas Metering system up to 20MMSCFD during the process shutdown. This reduced flare gas emission from the field to atmosphere around 3,033 tons of CO2 equivalent in 2022.
No takes yet. Share an insight, caveat, or question.
Kiertkul et al. (2024) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: