Field and numerical analyses reveal multidirectional uplift capacities for booster-assisted dynamically installed anchors, highlighting a framework for shared floating device mooring.
The multi-line anchor achieves the “anchor sharing” goal by allowing multiple floating devices to be moored, such that the total number of anchors in a floating device array can be reduced significantly. This study proposes a dynamically installed anchor with the potential of resisting uplift loading from varied directions. The multi-line anchor is dynamically installed with the aid of a booster. The installation performance of the hybrid anchor (i.e., multi-line anchor + booster) is first examined by field tests. Then, finite-element analyses are performed to investigate the uplift capacity of the anchor under V-H-M-T combined loading conditions. Based on the numerical results, yield envelopes are established for assessing the ultimate bearing capacity of the anchor. Additionally, model tests are conducted to quantitatively study the installation and setup effects on the uplift capacity of the anchor, indicating that the vertical and torque capacities are sensitive to the installation effect. Finally, a design framework is proposed to assess the stability of the multi-line anchor under combined loading conditions.
No takes yet. Share an insight, caveat, or question.
Liu et al. (2024) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: