In the process of a development project, numerous things need to be considered. The time control method used in this research was the Earned Value Analysis method. This research was conducted at the Pulantan River Embankment Improvement Project, Banjarbaru City. The data used in this research include the Time Schedule, Cost Budget Plan, and Weekly Progress Report. This data generates Planned Value and Earned Value. With the help of the Microsoft Excel program, the SV, SPI values, as well as the predicted final project completion time (TEAC and TE) were obtained. The analysis of the timing of the Pulantan River Embankment Improvement project in Banjarbaru City showed that in terms of implementation time, there will be a delay in the work plan schedule with an SPI value below (Negative) <1.00. As of the 25th week, the SPI value is 0.93. The estimated remaining work implementation time from week 25 is 2 weeks of implementation time. The estimated total time for completion of the Pulantan River Embankment Improvement Project in Banjarbaru City is 27 weeks which is 2 weeks longer than the contracted plan schedule of 25 weeks.
No takes yet. Share an insight, caveat, or question.
Prasetyo et al. (2024) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: