Answers are grounded in this paper and cite their sources.
Aim To achieve time between TURP to TWOC of four days or less. Background Most trans-urethral resection of prostate (TURP) operations is now done as day case procedures. Catheterisation is standard post TURP, to avoid clot retention and allow bladder irrigation if required. Currently, as patients are being discharged the same day, they are discharged with their catheter in situ. The catheter can be in-situ for longer than necessary, due to long waiting lists of the TWOC clinic. Method I performed a quality improvement project with the aim to achieve mean time between TURP and TWOC of four days or less. I reviewed the records 100 patients who underwent TURP between 21/07/2022 and 2/11/2022 in a district general hospital. For each patient, I calculated the time between TURP and TWOC. Results The average elapsed time was 9.49 days. The method of organising a TWOC post TURP is to email the urology nurses on the day of the TURP, stating that the patient requires a TWOC. My intervention was to therefore ask the bookings team that when they book in a TURP procedure, they also email the urology nurses to tell them in advance of the patients’ TURP date, that this patient will need a TWOC. Post intervention data was collected: the medical notes of 45 patients post intervention were reviewed. Conclusions The average time between TURP and TWOC had decreased to 6.61 days. This is an improvement but has not met the aim of less than or equal to 4 days.
No takes yet. Share an insight, caveat, or question.
Jones et al. (2024) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: