The research identified and assessed the risks in the execution of the construction and implementation project of the San Ignacio II-1 Hospital in Cajamarca in 2022, using the PMBOK Guide as a reference. Fifteen risks were identified, each with three root causes. A survey based on this guide was developed and applied to a population of 50 previously trained project workers. The results showed that 93.33% of the risks were of high or moderate priority. Of the total risks, 6.66% were accepted, 46.67% were avoided, and 46.67% were mitigated. In addition, the prioritisation and response to the risks was linked, determining that 33.33% were remediable, 53.33% tolerable and 13.34% deferable. These findings showed the need for effective risk management strategies to ensure the viability and safety, recommending regular reviews and clear communication to reduce unforeseen events and ensure project success.
No takes yet. Share an insight, caveat, or question.
Lizana-Adrianzén et al. (2024) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: