By introducing and comparing the commonly used economic benefit evaluation methods for power transmission and transformation construction projects under the Design and Build(DB) mode, the paper investigates which method should be used for different purposes of economic benefit evaluation. On this basis, the advantages and disadvantages of these methods and their application conditions have been discussed in depth so as to provide useful references for the economic evaluation work.
No takes yet. Share an insight, caveat, or question.
Ye et al. (2024) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: