Answers are grounded in this paper and cite their sources.
Pre-dewatering is an essential step in deep foundation pits with water-rich sand, and its impact on the surrounding environment has attracted increasing attention. To study the impact of pre-dewatering on the tunnel, we selected a typical foundation pit project in Shanghai to conduct in situ pre-dewatering tests and comprehensively record the soil stress, horizontal displacement, and tunnel deformation around the foundation pit during pre-dewatering. The data showed a strong correlation between the displacement and stress changes in the surrounding soil and the locations of the pre-dewatered soil layers. Based on the changes in the water-earth pressure and displacement, the deformation mechanism of the adjacent subway tunnel caused by pre-dewatering before foundation pit excavation was analyzed. Combined with existing research results, strategies such as increasing the stiffness of the ground wall, improving the anti-deformation ability of the soil in the passive area, and on-demand dewatering were proposed, and the findings can be used as reference for similar projects.
No takes yet. Share an insight, caveat, or question.
Wang et al. (2024) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: