Answers are grounded in this paper and cite their sources.
The fast and evolving power system requires low-cost solutions for the integration of new renewable sources. Six-terminal transmission or distribution lines are becoming an attractive option to allow the connection of solar and wind farms as it could overcome the limitation to build new lines and substations. These schemes could be also used to supply loads in high density areas or large industrial plants. Multi-terminal transmission lines create specific power protection challenges. In the past, the three-terminal line was considered the maximum number of terminals for reliable protection performance. Nowadays, line differential protection relays up to six-terminal makes this application more appealing as the unit scheme acts as the primary protection. Despite the availability of the 87L, the protection design should cater for the temporary or permanent loss of the line differential communication channel. Alternative sound protection methods should be available in the same relay. This paper reviews the challenges and possible solutions for the six-terminal scheme based on the distance protection, with and without communication available.
No takes yet. Share an insight, caveat, or question.
Torelli et al. (2024) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: