This month we present a report about a permanent works design engineer who noticed that hydro-demolition of the end of a floor supporting beam had taken place out of sequence. This introduced a pattern of bending moments and shear forces that were not considered in the original design.
No takes yet. Share an insight, caveat, or question.
A 2024 study studied this question.