Answers are grounded in this paper and cite their sources.
The optimal design of the process-inventory network utilizing periodic square waves yielded analytical solutions for process and inventory sizes under various design conditions. However, research has yet to be conducted where demand forecasting for finished products is not a periodic square wave function. It is usual for demand forecast to be the sum of periodic square wave functions that correspond to the motions of transportation equipment. Meanwhile, demand forecast data is collected as an aggregated arbitrary function following a longstanding practice. In this study, we want to create an optimization model that converts any arbitrary function into a sum of periodic square wave functions. The optimization objective is to minimize the absolute difference between the arbitrary function and the sum of periodic square wave functions. A developed optimization model is a mixed integer linear programming problem, which is intrinsically difficult to solve when the number of binary variables is high. The entire problem can be divided into several sets. This is acceptable in real applications.
No takes yet. Share an insight, caveat, or question.
Gyeongbeom Yi (2024) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: