Answers are grounded in this paper and cite their sources.
There are many types of work orders involved in the power supply, and the method of dispatching work orders is solidified. It is time-consuming and laborious to send orders for many times at the same time, of the same type or at the same site, and it requires on-site personnel to go back and forth to the site many times to handle and return orders one by one. At the same time, the allocation of system work orders at the grass-roots level depends on subjective judgment and familiarity with the business and personnel of the unit. It is often necessary to ask the location of field personnel and the current work completion by telephone, lacking relevant guidance, and the manual allocation of work orders is heavy and unscientific. In order to solve the above problems, this paper studies the intelligent automatic scheduling strategy of power supply working tickets based on multi-dimensional weight calculation. First, a distance weight model is established based on employee and work order data. On this basis, a capacity load weight model and the work order urgency weight model are further established. On the basis of the above weight model, an intelligent automatic scheduling and dispatching strategy of work orders based on multidimensional weight calculation is established. Finally, the validity of this strategy is verified by calculation.
No takes yet. Share an insight, caveat, or question.
Kang et al. (2024) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: