Autonomous factories require high levels of adaptability, flexibility, and resilience to react to uncertainties on the shop floor, such as machine downtime. This paper proposes a negotiation-based, partial rescheduling method, combined with an existing multi-agent system, to swap jobs between machines. The negotiations are restricted to machines within the same work center, giving rise to a partial reschedule. A learning algorithm is also utilized, allowing machines to individually learn how to evaluate proposed bids from other machines and adapt the bids to their current environment. The main objective is to minimize the mean weighted tardiness of all jobs. Computational results indicate an improvement of 10-30 tardiness, compared to continuous rescheduling and complete rescheduling methods. In addition, a decrease of 70-80 sensitivity analysis and analysis of the partial reschedule.
No takes yet. Share an insight, caveat, or question.
Didden et al. (2024) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: