October 11, 2025Journal La MultiappOpen Access

Comparative Analysis of the Support Capacity and Settlement of Bored Pile Foundations Using Manual Methods and Allpile Software: Case Study

View Full Paper
Ask AI
Bookmark
Share

Authors

SHSyarif HidayatullohMPMaya Saridewi PascanawatyHHHafiz Hamdani

Discussion

Loading...

Member takes

Overview

Case study compares bearing capacity and settlement of foundations using manual methods and Allpile software, highlighting significant differences.

Key Points

  • Bored pile foundations should ensure transfer of load does not exceed soil bearing capacity for safety.
  • Manual methods resulted in a maximum bearing capacity of 13,127.79 kN, compared to 14,391.891 kN from Allpile software.
  • All evaluated settlements for piles remained below maximum permitted limits, ensuring structural stability.
  • Secondary data from Detailed Engineering Design and soil tests were key in assessing foundation capacities.

Cite This Study

Hidayatulloh et al. (2025) studied this question.

synapsesocial.com/papers/68e9b2e4ba7d64b6fc1330dchttps://doi.org/10.37899/journallamultiapp.v6i6.2530
View Full Paper
Ask AI
Bookmark
Share

Also Consider

Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context:

  1. 1Bored Pile Foundation Analysis Using the Meyerhof Method2024
  2. 2Analysis Of Bearing Capacity Of Pile Foundations Using Analytical Method And Finite Element Method2024 · 2 citations
  3. 3Bearing Capacity and Settlement of Bored Pile Foundation Based On Spt Test Data Aand CPT Test2024
  4. 4Analysis of Borepile Foundation Bearing Capacity in Building Construction Projects with Pile Driving Analyzer Test2025
  5. 5Analysis Of The Bearing Capacity Of The Boredpile Foundation In The Advanced Construction Project Of Class Iia Prison Pematang Siantar Using Analytical Method And Finite Element Method With Plaxis 2D2025