Answers are grounded in this paper and cite their sources.
Assessment using standardized workflows improves dynamic reservoir simulation and production rates, suggesting better ICT selection for recovery.
Many inflow control technologies (ICTs) are available and selecting the suitable technology is not trivial. A comprehensive workflow and supporting simulations to guide the evaluation and selection of ICTs are presented in this paper with a new open-source script to efficiently include advanced completions in reservoir simulation. The objective of this paper is to show how a standardized workflow can optimize the installation of ICT to increase recovery due to constrained capacity in the topside, as well as enhancing the quality in business decisions and increase efficiency for the evaluation work. The type of ICT should be selected based on production objectives, e.g. balancing the inflow profile along reservoir sections, restricting unwanted fluids due to gas or water coning, or zonal and branch control. The specific device can be recommended based on reservoir and PVT properties, expected production or injection rates, and risk assessment. We compare these ICT candidates by both static and dynamic simulations, to support the business case evaluation. In addition, we present a new open-source tool to properly include ICTs into an ensemble of reservoir simulations for assessing the business case. The results of ICT evaluations include the flow and pressure drop in devices, annulus, and tubing. Furthermore, swell packer placement is modelled to study their impact on the production profile. In this paper, we present a field example where this workflow has been implemented to improve the business case. It includes evaluation on the near-wellbore modelling simulation study and dynamic reservoir simulation. The results show varying performance for several types of AICDs and selecting the optimum case will provide accelerated and increased oil, reduced water production, and CO2 emissions and intensity reduction for the field case example. This paper presents a consistent workflow to select the optimal ICT for a field or well development, and a standardized tool to include ICTs in static and dynamic simulation. The importance of modelling a more accurate description of the lower completion to obtain more realistic simulation results is highlighted in this paper. The new standardized workflow serves as an instrument to decide the most appropriate inflow control technology for a given well planning and field development process, thus maximizing value creation.
No takes yet. Share an insight, caveat, or question.
Sutoyo et al. (2025) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: