Answers are grounded in this paper and cite their sources.
Observational analysis highlights contamination risks in flexible pipelines during decommissioning, suggesting urgency for safe practices.
The decommissioning of offshore oil and gas infrastructure is steadily becoming one of Brazil's most pressing challenges, bringing to the surface not only regulatory and environmental concerns but also complex operational demands. Among these, a particularly critical issue has emerged: how to safely manage flexible pipelines that may be contaminated with Naturally Occurring Radioactive Material (NORM). Flexible pipelines, built from multiple layers of polymers and metallic reinforcements, have long been valued in subsea projects for their adaptability and strength. Yet, over years of operation, they tend to accumulate internal scales and sludge where NORM can settle. What makes this a real concern is that dismantling such structures without proper care can release hidden contamination, turning routine decommissioning into a radiological hazard. The scale of the challenge is growing fast. Petrobras's strategic outlook points to nearly 2,000 kilometers of flexible pipelines scheduled for removal by 2028. In 2024 alone, close to 1,000 kilometers of subsea lines were expected to be taken out of service, with dozens more operations planned for the following years. These numbers leave little doubt: safe, transparent, and sustainable approaches are no longer optional — they are urgent.
No takes yet. Share an insight, caveat, or question.
Preza et al. (2025) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: