Answers are grounded in this paper and cite their sources.
Pilot project improved oil production and reduced water cut in a matured oil field, indicating effective EOR application.
The field described in the case study has been in production for over five decades, tapping into a multi-layered sandstone reservoir. The oil extracted from this field is heavy, with varying viscosity levels throughout the area. This paper outlines a comprehensive approach to the design and implementation of a chemical enhanced oil recovery (EOR) scheme in a matured oil field introducing an integrated methodology for laboratory and pilot design, aiming at full-field commercial EOR scheme. Extensive screenings and core flood studies have been carried out to get a stable chemical formulation reaching desired interfacial tension (IFT), residual oil saturation and retention. Sensitivity and optimization simulations are performed on various parameters to design an optimal pilot project, closely monitored for vital parameters. Field data, particularly water cut trend and breakthrough of chemicals, acquired from the pilot project is incorporated into the simulation model and history matched for fine tuning and calibration of the simulation model. This paves the way for designing of full field commercial scheme. The case study elucidates the experiences gathered from designing a commercial chemical EOR scheme in a matured field with over 350 wells, having reached more than 40 % primary recovery. Pressure and water cut trend indicate very strong aquifer support. Strong interaction between alkali and crude oil has been found to result in the formation of highly viscous water-oil emulsions that can cause the reservoir damage and reduce the production rate. Taking into account the geological and physical characteristics of the reservoir, surfactant-polymer (SP) flooding was selected as the most suitable method in terms of economic and technological criteria. Pilot project has been designed as normal five-spot pattern with optimized concentrations of surfactant, polymer and co-solvent at formation water salinity. Implementation of pilot SP scheme resulted in significant enhancement in oil production and reduction in water cut even with higher withdrawal rates. The proposed SP scheme, encompassing 55 patterns, is projected to yield a 7% incremental oil gain over the base case scenario. This paper contributes novel insights by demonstrating the integration of laboratory studies, pilot projects, and full-field reservoir simulation in optimizing chemical EOR processes. By quantifying uncertainties and optimizing economic value alongside oil recovery, it provides valuable guidance for capital-intensive EOR projects in the petroleum industry.
No takes yet. Share an insight, caveat, or question.
Goswami et al. (2025) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: