Answers are grounded in this paper and cite their sources.
Case study shows a new variant process-planning tool reduced planner time by 70% and errors to zero, indicating significant gains in customised production.
Purpose: This study addresses the development of a variant process planning tool, following the Knowledge-Based Variant Process Planning methodology, applied in a case study and presents the gains achieved. Methodology/Approach: Case study supported by six steps: (1) Feature Analysis, (2) Knowledge Retrieval, (3) Inference, (4) Plan Adaptation, (5) Knowledge Update, and (6) Plan Validation/Optimisation.. Findings: The implementation of the Knowledge-Based Variant Process Planning tool led to significant improvements: planner time reduced by 70%, analyst workload by 90%, and process plan errors to 0%. Results show this approach significantly improves process planning in customised production. Research Limitation/Implication: The limitations are associated with the specificity of the case study problem – the electric engine production systems. Originality/Value of paper: This study helps fill the gap in case studies on the Variant Process Planning approach, specifically for electric engine production systems, paving the way for similar companies to adopt Knowledge-Based Variant Process Planning.
No takes yet. Share an insight, caveat, or question.
Mota et al. (2025) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: