Numerical analysis reveals key parameters influencing packing effectiveness in marine gas hydrate reservoirs, suggesting optimized sand control strategies.
Drill pipe pullback gravel packing is a novel sand control method for marine natural gas hydrate reservoirs, enabling rapid and uniform filling by synchronizing fluid injection with pipe retraction. However, the complex liquid–solid two-phase flow mechanisms and parameter sensitivities in this dynamic process remain unclear. To address this gap, a coupled Computational Fluid Dynamics and Discrete Element Method (CFD-DEM) approach is adopted in accordance with the trial production requirements in the South China Sea. This investigation systematically analyzes the relative contributions of injection rate (0.8–2.2 m3/min) and sand-carrying ratio (30–60%) to the packing effectiveness. Additionally, the effects of carrier fluid viscosity and drill pipe pullback speed are explored. Results show that injection rate and sand-carrying ratio positively affect performance, with sand-carrying ratio as the decisive factor, exhibiting an impact approximately 73 times greater than that of the injection rate. Optimal parameters in this study are injection rate of 2.2 m3/min and sand-carrying ratio of 60%, which yield the highest gravel volume fraction and stable bed height. Furthermore, it is also found that while increasing carrier fluid viscosity improves bed height, excessive viscosity hinders particle settling and compaction. Similarly, a trade-off exists for the pullback speed to balance packing density and pipe burial risks. These findings provide a theoretical basis for optimizing sand control operations in hydrate trial productions.
No takes yet. Share an insight, caveat, or question.
Shi et al. (2025) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: