Experimental validation demonstrates an innovative framework for precise adjustment of ballastless track geometry, implying significant improvements in efficiency and material savings.
The geometric precision of ballastless tracks critically determines the performance and safety of high-speed railways. Traditional manual fine adjustment methods remain labor-intensive, iterative, and sensitive to human expertise, making it difficult to achieve sub-millimeter accuracy and global consistency. To address these challenges, this paper proposes a virtual-model–enabled pre-adjustment framework for high-speed ballastless track construction. The framework integrates a dual-frame SLAM-based and multi-sensor measurement system based on RC-SLAM principles and a local attitude compensation model, enabling accurate 3D mapping and reconstruction of long-track segments under extended-range and GNSS-denied conditions typical of linear infrastructure scenarios. A constraint-based global optimization algorithm is further developed to transform empirical fine adjustment into a computable geometric control problem, generating executable adjustment configurations with engineering feasibility. Field validation on a 1 km railway section demonstrates that the proposed method achieves sub-millimeter measurement accuracy, improves adjustment efficiency by over eight times compared with manual operations, and reduces material waste by $2800–$7000 per kilometer. This paper demonstrates a previously unexplored execution-level workflow for long-rail fine adjustment, establishing a closed-loop paradigm from measurement to predictive optimization and paving the way for SLAM-driven, simulation-based, and multi-sensor–integrated precision control in next-generation railway construction.
No takes yet. Share an insight, caveat, or question.
Cui et al. (2026) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: