Answers are grounded in this paper and cite their sources.
Analysis shows that timing flexibility and demand uncertainty affect investment outcomes in airports, suggesting better strategies.
We study the optimal timing for two types of complementary investment projects — capacity expansion and cost reduction — at an airport. Considering the complementarity between these projects, as well as timing flexibility and demand uncertainty, we derive the optimal rules for investment. Numerical examples show that both investment projects can be made earlier by factors such as a lower private share or a greater total number of airlines. A comparison of suboptimal rules reveals that the expected loss resulting from ignorance of the complementarity is much lower than that associated with not considering timing flexibility or demand uncertainty in most cases.
No takes yet. Share an insight, caveat, or question.
Xu et al. (2022) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: