Identifies barriers to LCCE5.0 implementation in Morocco, highlighting procurement challenges and recommendations.
Integrating Lean Construction (LC), the Circular Economy (CE), and Construction 5.0 (C5.0) remains challenging in emerging delivery contexts. This difficulty increases when procurement routines determine which practices become enforceable across tendering, contracting, and site execution. This study prioritized barriers to LCCE5.0 implementation in Morocco and translated expert judgments into actionable recommendations. A structured literature review informed the barrier inventory and conceptual framing. The study proposed a three-layer, life-cycle LCCE5.0 framework that links governance, operational routines, and digital enablers. It operationalized 40 critical barrier factors across six dimensions and five life-cycle macro-phases. A two-round Delphi study was conducted with 22 Moroccan experts using a 7-point Likert scale. Barriers were ranked using Round 2 (T2) medians with ties resolved using the interquartile range. Top-box agreement (ratings of 6–7) and consensus tiers were reported. The ranking showed strong stability across rounds, with 92.5% of barrier factors remaining stable. Kendall’s W at T2 equaled 0.817 (p < 0.001), indicating high panel consensus. Results indicated that constraints clustered in upstream governance. Three procurement-centered regulatory and contractual barriers topped the ranking (Mdn_T2 = 7). These barriers reflected missing CE procurement guidelines, limited weighting of environmental criteria, and the absence of circularity and digital requirements in tenders. Six additional barriers reinforced this procurement bottleneck. They included limited owner commitment, weak enforcement authority, limited top-management commitment, and regulatory instability. They also included low interorganizational trust, limited risk-sharing contracts, and tool-centered deployment of LCCE5.0 practices. These findings support procurement-focused recommendations to institutionalize auditable circular requirements and data-enabled verification in tendering and contracting routines. The proposed LCCE5.0 mechanism and the resulting recommendations require empirical validation beyond this Delphi-based prioritization.
No takes yet. Share an insight, caveat, or question.
Hafiane et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: