Flood engineering in Britain is evolving from traditional approaches based on design standards to the development of risk-based decision-making, which involves taking account of a range of loads, defence system responses and impacts of flooding. Adopting such a ‘whole systems’ approach enables combinations of structural and non-structural approaches to be assessed and compared so resources can be targeted to best effect. Building on methods and know-how already in widespread use in river and coastal engineering, risk-analysis techniques are now being adopted in all areas—from high-level planning based on outline analysis to detailed designs using high-resolution simulation models. This paper explores some of the new techniques of this emerging approach to flood risk management.
No takes yet. Share an insight, caveat, or question.
Sayers et al. (2002) studied this question.
Synapse has enriched 2 closely related papers on similar clinical questions. Consider them for comparative context: