Conditional feasibility analysis highlights a financing roadmap for a solar energy system via Japan-US alliance.
Version 2 (April 2026): Revised following peer review preparation. Abstract reframed as conditional feasibility analysis. TEPCO mechanism repositioned as stylized case study. IRR sensitivity analysis (Table 3) added with four downside scenarios. Figure 1 (financing roadmap) added. Conclusion upgraded to emphasize option value framing. Version 3 (April 2026): Added presentation slides in English (EN) and Japanese (JA) versions as PDF files. 18-slide deck covering technical roadmap, financing architecture, and governance framework.