Excavation and dewatering are the primary factors governing diaphragm wall deformation and ground surface settlement in deep foundation pits. However, their coupled effects in soft-over-hard composite strata remain insufficiently understood. This study investigates a deep metro foundation pit in Jinan, China, and develops a three-dimensional hydro-mechanical coupled model in ABAQUS to simulate the complete staged excavation and dewatering process. The evolution of diaphragm wall lateral displacement, ground surface settlement, and pore-water pressure was systematically analyzed, and the simulation results were validated against field monitoring data. The results show that both excavation and dewatering induced significant wall deformation and surface settlement, with excavation playing the dominant role. The incremental lateral displacement of the diaphragm wall caused by excavation was approximately 2.6–3.8 times that caused by dewatering, while the corresponding ground surface settlement was 7.9–10.7 times greater. Owing to the strong restraint provided by the underlying rock stratum, the maximum lateral displacement of the diaphragm wall occurred at approximately 0.67 He, where He is the final excavation depth. The primary influence zone of ground surface settlement extended to approximately 2 He. In addition, dewatering altered the seepage field inside and outside the pit, leading to a continuous decrease in pore-water pressure within the pit, whereas the external pore-water pressure remained largely unchanged because of the seepage-barrier effect of the diaphragm wall. These findings provide practical guidance for the design and construction of deep foundation pits under similar geological conditions.
Wang et al. (Wed,) studied this question.