Answers are grounded in this paper and cite their sources.
Historic Building Recording documents ten buildings in Glenfinnan prior to construction, ensuring preservation and understanding of historical architecture.
A basic level Historic Building Recording (HBR) was successfully completed of the buildings prior to construction in accordance with an approved written scheme of investigation (WSI). The site investigation recorded ten buildings situated within a clearing within the forestry. The farmhouse (Building 1) and out-buildings (Building 2 and 3) were in relatively good condition. The farmhouse was found to have three phases of construction with the first two phases mapped on the 1st (1871) and 2nd (1900) edition Ordnance Survey (OS). The floor plan of the house recorded seven rooms with modern fixtures and fitting throughout. The out-buildings were both constructed c.1900.
No takes yet. Share an insight, caveat, or question.
Donald Wilson (2023) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: