This is the authors' abstract. We don't add key points for this paper.
This paper proposes a multiobjective optimization approach for planning railway ballast, rail, and sleeper renewal operations. The objective is to support an informed decision that considers not only the railway track life-cycle cost (LCC) but also the track occupation times required to perform interventions. Two objective functions were minimized, as follows: (1) railway track unavailability caused by railway track maintenance and renewal operations, and (2) railway track components’ LCC. Furthermore, to rationalize the renewal strategy, the model considers a multicomponent formulation that assesses, in time and space, the opportunistic combination of railway track renewal activities. A numerical application of the model on a real case study (Lisbon-Oporto line) is developed and discussed. The results show the interest of using this simple multiobjective optimization approach to obtain a decision-making process to support the scheduling of major railway track renewal works with an informed LCC-unavailability trade-off.
Answers are grounded in this paper and cite their sources.
No takes yet. Share an insight, caveat, or question.
Caetano et al. (2013) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: