Answers are grounded in this paper and cite their sources.
To enhance the operational resilience of urban power grids during extreme disaster scenarios and curtail power outage duration and scope, a scheduling strategy comprehensively incorporates the active power regulation capability of diverse flexible resources and the cooperative optimization of transmission and distribution networks is proposed. The multifaceted flexible resource scheduling framework encompasses output adjustment of distributed photovoltaic units, demand response mechanisms, and utilization of energy storage equipment. Building upon this, a two-level upstream-downstream cooperative optimization model for transmission and distribution networks is introduced. On the upper level, an optimal load transfer model is constructed for the transmission network to address the operational boundary between the regional high-voltage distribution network and the upper-level transmission network. Based on the operational boundary obtained from the upper level, the lower level of the model reconstructs the regional high-voltage distribution network and schedules various types of flexible resources in real-time to minimize the curtailment load under fault scenarios. Simulation results demonstrate that the proposed method effectively reduces line congestion by 8.61 %, minimizes curtailment load by 112.24 MW, and improves the operational resilience of urban power grids during extreme disasters by 9.15 %. Furthermore, the power flow of transmission network lines is ensured to remain within limits, with a deviation of only 1.12 %, the proposed two-level model takes 2.62 s to find the optimal solution. These results validate the effectiveness of the proposed model in achieving efficient resource allocation, enhanced grid stability, and reduced outage impact.
No takes yet. Share an insight, caveat, or question.
Li et al. (2025) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: