Evaluates overlay schemes' performance and cost in expressway reconstruction, suggesting a balanced design approach.
To address the large variability in existing pavement distress in expressway reconstruction and expansion projects in Zhejiang Province, China, a differentiated overlay design and decision-making method based on multi-index evaluation was proposed using the Ningbo section of the Yongtaiwen Expressway as a case study. Based on 3D ground-penetrating radar (GPR), falling weight deflectometer (FWD), and field coring tests, the existing pavement was classified into five conditions: intact pavement, slight and severe surface-layer distress, and slight and severe base-layer distress. For pavements with surface-layer distress, two alternative overlay schemes were designed. Scheme I was defined as a performance-oriented scheme using high-performance SMA/Superpave asphalt layers and an ATB-25 transition layer where necessary to improve fatigue resistance and coordinated structural performance. Scheme II was defined as an economy-oriented scheme using conventional AC layers and crack-resistant or bonding measures to reduce construction cost while maintaining adequate structural capacity. An ABAQUS-based temperature–load coupled finite element model considering the temperature-sensitive viscoelastic characteristics of asphalt layers was established to analyze the mechanical responses and service lives of the overlay schemes, and the entropy weight–TOPSIS method was used for multi-objective comprehensive decision-making. The results showed that temperature–load coupling markedly increased the tensile strain at the bottom of the asphalt overlay and was a key controlling factor in design. All schemes satisfied the 15-year design requirement, while the base-layer fatigue life of the performance-oriented scheme (Scheme I) was generally no lower than that of the cost-oriented scheme (Scheme II), indicating better long-term service reliability. In addition, the relative closeness coefficients of Scheme I under slight and severe surface-layer distress were 0.586 and 0.546, respectively, both higher than those of the cost-oriented scheme. The proposed method can effectively balance technical performance and life-cycle cost and provides a useful reference for differentiated overlay design in similar expressway reconstruction and expansion projects in hot–humid regions.
No takes yet. Share an insight, caveat, or question.
Wu et al. (2026) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: